Pump Stations Electrical Work
read more below
Pump Stations Electrical Work
read more below
Karratha Airport
read more below

Electrical Work


KAHU-19Firedam Civil PTY/LTD has done numerous projects in the energy sector. Whilst we are not an electrical company, we have had to design and construct kilometres of electrical conduiting for the type of civil works we have constructed from waste water treatment plants, to pump stations to working substations and distribution mains.

Firedam Civil engage the designer where the works require this. As part of the works we mainly take care of all the civil works including conduiting, pits, transformers, switch gear, power pole / light pole installation, cable hauling and supply of all the above. We always contract a sub-contractor to complete the connections, jointing, terminations, testing and any other specialised work that may be required depending on the size and nature of the works. We may also get them to be involved in the design and ordering of control cabinets/electrical cubicles and other detailed parts of the works such as SCADA or telemetry requirements to make sure the works run smoothly.

We try and work with the same electrical sub-contractors at all times as it makes the relationship more valuable and there is a greater understanding of needs. Some of the projects that we have worked on we will now list.

KAHU-24PZ-01

 

Karratha AirportPZ-08

5 x pump stations
1 x waste water treatment plant (with backup)
2 x fire pumps (with backup)
Value   $8.5M
Client   Roebourne Council / City of Karratha

 

Willoughby Zone Sub Station

see list

 

Perth Zoo

Power and Communications (with other works)
Value   $600,000
Client   Dept. of Finance WA
 

Pump Stations

14 on the South Coast
16 at various other locations

Clients include, Sydney Water, Roebourne Council, Dept. of Finance WA, DPW&S and some private developers. We are happy to come and talk about what your needs may be and are willing to help where we can. We have also worked on numerous other assets for different energy organisations varying in cost from $200,000 to several million.

 

PZ-02

PZ-01

 

 

 

 

 

 

 

 

 

 

 

 

 

 PZ-02PZ-03